◆发表论文
[23] Pin Liu, Chen Guo, Shengai Cui, Wei Xia, Xuewei Wang,Xuemei Chen. Experimental study on crack propagation process of rock-concrete interface in hot-dry curing environment at different temperatures. Structural Concrete. 2023;1–16.
[22] Zhao, N., Jia, S., Zhu, Z., Huang, X., Xiao, W., & Wang, X. . (2022). Direct convolution integration method for random vibration analysis of structures subjected to nonuniformly modulated nonstationary excitations. Mechanical Systems & Signal Processing, 178.
[21] Wang, X.; He, Q.; An, Z.;Liu, G.; Wen, X.; Wang, Y.; Zhong, Z. Experimental Study of Perfobond Rib Shear Connector under Lateral Force. Appl. Sci. 2021, 11, 9088. https://doi.org/10.3390/app11199088(SCI/EI, IF=2.679)
[20] 许基厚,王学伟,祝兵,等. 非对称单侧混合梁斜拉桥多点激励地震响应分析[J]. 地震工程学报,2019, 41(5):1-6.(CSCD)
[19] Yingliang Tan, Bing Zhu, Tingyi Yan, Biao Huang, Xuewei Wang, Wenwei Yang and Bo Huang. Experimental Study of the Mechanical Behavior of the Steel–Concrete Joints in a Composite Truss Bridge[J]. Appl. Sci. 2019, 9, 854. (SCI收录)
[18]王学伟,祝兵,刘国军,许基厚,谢明志.桩土作用下公铁两用斜拉桥强地震倒塌研究[J].铁道工程学报, 2019, 36 (03): 38-44.(EI)
[17]王学伟.公铁两用斜拉桥强地震作用下的连续倒塌过程数值模拟[J].西南公路, 2018 (03): 137-142.
[16]. Xuewei Wang, Bing Zhu, Shengai Cui, Eric M. Lui. Experimental Research on PBL Connectors Considering the Effects of Concrete Stress State and Other Connection Parameters[J]. Journal of Bridge Engineering, 2018, 23(1): 04017125(SCI/EI, IF=1.476)
[15]. 谢明志, 杨永清, 卜一之, 赵灿晖, 张克跃, 王学伟. 千米级混合梁斜拉桥双目标控制施工监控体系[J]. 西南交通大学学报, 2018, 53(2): 244-252,321.(EI)
[14]. Xuewei Wang, Bing Zhu, Shengai Cui. Research on Collapse Process of Cable-stayed Bridges under Strong Seismic Excitations[J]. Shock and Vibration, 2017(2017): 1-18. (SCI/EI, IF=1.281)
[13]. Shengai Cui, Pin Lui, Xuewei Wang(Corresponding Author), Deli Xu, Yuezhong Ye. Experimental Study on Deformation of Shotcrete Use in High Geothermal Tunnel Environments[J]. Computers and Concrete, 2017, 19(5): 443-449. (SCI/EI,IF=0.849)
[12]. 韩兴,王学伟,祝兵,谢明志. 大直径混凝土榫PBL连接件力学性能试验[J]. 长安大学学报(自然科学版),2017,37(1):67-75.(CSCD)
[11]. 王学伟,祝兵,卜一之,谢明志. 基于几何控制法的斜拉桥主梁制造夹角误差变化及传播规律研究[J]. 四川建筑科学研究,2016,42(3):124-129.
[10]. 祝兵,王学伟. 考虑横向预应力效应的钢-混凝土组合梁桥PBL剪力键实验研究[J]. 西南交通大学学报,2016,51(4):621-631.(EI)
[9]. 王学伟,祝兵,宋随弟. 小砂沟大桥大孔径PBL剪力键试验研究[J]. 桥梁建设,2015,45(5):66-71.(EI)
[8]. 王学伟,卜一之,祝兵,谢明志,贾少敏. 六塔斜拉桥主梁制造阶段参数敏感性研究[J]. 公路交通科技,2015,32(1):76-82.(CSCD)
[7]. Wang Xuewei, Zhu Bing, Li Hongxue. The Key Technology Research of the Pushing Closure Process about Jiashao Bridge Based on Geometric Control Method[C]//Advanced Materials Research. Trans Tech Publications, 2014, 1025: 885-890.(EI)
[6]. 谢明志,卜一之,张克跃,王学伟,翁方文,彭华军. 特大跨度混合梁斜拉桥几何控制法参数敏感性[J]. 长安大学学报(自然科学版),2014,34(3):66-73.(EI)
[5]. Xie Mingzhi, Yang Yongqing, Bu Yizhi, Wang Xuewei, Zhang Keyue, Wei Ran. Influence of Error of Unstressed Cable Length on Mechanical Behavior of Thousand-meter-scale Hybrid Girder Cable-stayed Bridge[J]. Journal of Highway and Transportation Research and Development, 2014, 8(3): 30-36.(CSCD)
[4]. Xiang B S, Han X, Wang X W. Numerical Simulation Method of Track Irregularities Based on Secondary Filtering[C]//Advanced Materials Research. Trans Tech Publications, 2014, 1008: 1525-1529.(EI)
[3]. Li H X, Duan L L, Wang X W, Zhu B. Finite Element Simulation of Large Segment Hoisting Construction for Hong Kong-Zhuhai-Macao Bridge[C]//Advanced Materials Research. Trans Tech Publications, 2014, 919: 551-555.(EI)
[2]. Zhao Y M, Li H X, Wang X W. Estimation Method for Prestress Loss of Externally Prestressed Composite Girder Bridges[C]//Advanced Materials Research. Trans Tech Publications, 2014, 919: 547-550.(EI)
[1]. Duan L L, Zhao Y M, Wang X W. An Analysis on the Deformation of an Arch Bridge under the Action of Live Load by Using ANSYS[C]//Advanced Materials Research. Trans Tech Publications, 2014, 919: 533-537.(EI)